Our Volumetric M-Pod is the go-to solution for construction projects looking to leverage the benefits of prefabricated bathroom pods designed for HCAI compliance. Our self-contained, fully finished bathroom pods are precisely designed and manufactured under our stringent quality management program in a climate-controlled environment to ensure the highest quality.  All materials manufactured or procured are 2022 California Building Code and HCAI compliant.

  • ICC-ES CERTIFIED COLD FORMED STEEL STUD FRAMING PRODUCTS MANUFACTURED IN HOUSE
  • INTEGRATED LIFTING AND SETTING SYSTEM FOR LOADING / UNLOADING AND PLACEMENT
  • FULLY FINISHED INTERIOR SPECIFIC TO YOUR NEEDS

PCS/OMP Approval: Pending

DOWNLOAD CATALOG

Benefits of Our Restroom Pod Construction & Delivery

When managing healthcare construction projects, you have four pillars of success – quality, safety, cost, and schedule. Our products improve your ability to run your project efficiently, safely, with cost certainty, and on schedule from start to finish every time.

QUALITY – We use high-quality standard building materials; all our products undergo a rigorous QC / QA process, and we utilize machine automation to ensure consistent quality.

SAFETY – Moving construction activities off-site to our controlled manufacturing environment reduces the amount of community traffic, job site congestion, trade stacking, on site material, debris, and waste as well as overall man hours on the project, helping reduce accidents and mitigate risk.

BUDGET – Our BIM and manufacturing process increases cost certainty, allowing for better budget management while achieving design intent.

TIMELINE – Installation of M3C products, including our HCAI bathroom pod, can be completed 30% – 50% faster than conventional stick-built construction methods. This, coupled with the ability to manufacture products while onsite work is in progress concurrently, greatly reduces your project timeline.

COMMON QUESTIONS ABOUT OUR HCAI BATHROOM POD

The patient restroom pod fully finished with drywall, door frame, lighting, plumbing, HVAC, fixtures and accessories has an approximate weight of 2,300lbs.

We coordinate special and onsite inspections as required, can utilize an onsite IOR and document all testing, inspection and quality management processes by workstation in our STRATUS management software that allows for download and submission as required by the project documents.

Our volumetric pods are designed to reduce torsion, shifting, and damage thanks to M3’s framing techniques and the integration of a structural ceiling panel that is boxed and triangulated to create the utmost rigidity.

Let us help you open your doors to patients sooner!