Install

Installation Process

Panels are flat-packed and pods are enclosed with a heavyweight waterproof shrink-wrap system that provides protection from elements and wind during transportation. Upon delivery, certified installers anchor the products and final MEP connections are made. The use of off-site manufacturing offers:

  • Reduced Inspection time
  • Elimination of Rework
  • Schedule & cost certainty
  • optimized sustainability

Certification Program

The Certified Installer Program is a three-day training developed by M3 Components. Attendees learn in interactive groups and are given hands-on experience with all M3C’s product lines, including M-Pods and M-Walls. The training includes two days at M3C’s MEP Manufacturing Facility and one day in the field where attendees learn the fundamentals of:

  • Installation
  • Anchoring
  • MEP Connection Points

Let us help you open your doors to patients sooner!